CORNING ONE OIU Fiche d'installation rapide - Page 3
Parcourez en ligne ou téléchargez le pdf Fiche d'installation rapide pour {nom_de_la_catégorie} CORNING ONE OIU. CORNING ONE OIU 8 pages. Optical interface unit
2.
ADDITIONAL REQUIRED ITEMS (NOT PROVIDED)
1. MTP®-LC APC harness cable (P/N: 37HP900162-006F) — consists of connector
for splitting fibers (six) leading from OIM to fiber management unit (FMU)
EDGE™ module
2. Four rack-mount nuts and screws for securing unit in rack
3. Grounding tools and components:
• Grounding wire — grounding wire should be sized according to local and
national installation requirements. The provided grounding lug supports
14 AWG to 10 AWG stranded copper (or 12 AWG to 10 AWG solid) wire conductors.
Note: The length of the grounding wire depends on the proximity of the switch to proper grounding facilities.
• Phillips-head screwdriver
• Crimping tool — for crimping grounding wire to the grounding lug.
• Wire-stripping tool — for removal of insulation from wire
3.
INSTALL UNIT IN 19-IN RACK
Notes:
Up to four OIU chassis can be connected to a
single HEU
OIU chassis requires 4U rack height availability
Step 1:
Determine the location of the OIU in the rack
while considering additional HEUs and OIUs and
the lengths of the ERFCs (described in HEU quick
installation sheet).
Figure 1 and Figure 2 describe the optimal rack
installations for 4x4 HEU-OIU configurations in
shared and dedicated equipment scenarios.
Step 2:
Referring to Figure 3, secure the units' rack ears
to the rack frame as follows:
• Insert two screws halfway into the rack frame.
• Position the chassis on to the screws using the
• Secure the unit in the rack via all applicable
Corning Optical Communications
handles and the top and bottom half slots of
the rack ears.
bracket holes using the appropriate rack nuts
and screws.
Harness Cable
Figure 1. 4x4 Rack Installation Diagram – Dedicated
Figure 2. 4x4 Rack Installation Diagram – Shared
Figure 3. Positioning Chassis in Rack
Quick Installation Sheet | CMA-263-AEN | Page 3