Kohler TOOBI II Series Manuel d'instructions d'installation - Page 4
Parcourez en ligne ou téléchargez le pdf Manuel d'instructions d'installation pour {nom_de_la_catégorie} Kohler TOOBI II Series. Kohler TOOBI II Series 6 pages. Vanity tops & cabinets
INSTALLATION
2
Water supply and waste pipe holes
(a) Measure and mark the centres for water
supply & waste pipes on the back of the
cabinet. With a suitably sized hole saw drill
the holes for the water supply and waste.
(b) Having drilled the required holes, fit the
cabinet into position over the pipework.
3
Fixing the vanity to the wall
(a) Before fastening the cabinet make sure that
it is sitting level and square.
(b) Fix the cabinets to the wall using screws (min
10g x 75mm) and *20mm washers.
(c) Screws should be placed in an evenly spaced
pattern as shown in Fig. 2.
• 600mm cabinets require a minimum of 5 screws
• 900mm cabients require a minimum of 7 screws
4
Vanity Top Installation
(a) Unpack the top and check for any damage that
might have occured in transit. Check and
confirm the fit of your selected tapware.
Please disregard the supplied fixing kit.
(b) Apply a continuous bead of silicone (not
supplied) to the top edge of the cabinet sides
and back. Ensure there are no gaps in the
sealant bead. This will ensure the top stays
securely fitted to the cabinet and no water
spillage will find its way into the cabinet.
(c) Place the vanity top onto the cabinet ensuring
that the back is flush against the wall and
there is an even overhang on either side of the
cabinet.
(d) Wipe off any excess sealant.
-4-
Fig. 2