Aqua Cooler AC-PV8EBFY-ASM Manuel d'utilisation et d'entretien - Page 3

Parcourez en ligne ou téléchargez le pdf Manuel d'utilisation et d'entretien pour {nom_de_la_catégorie} Aqua Cooler AC-PV8EBFY-ASM. Aqua Cooler AC-PV8EBFY-ASM 11 pages.

IMPORTANT INFORMATION ABOUT GROUNDING
To provide additional protection from the risk of shock, this unit must always be connected to
a residual-current device (RCD) or a breaker. Use of joint cable should be avoid.
This appliance must be grounded. Improper use of the grounding plug can result in a risk of
electric shock, causing serious injury and possibly death.
This appliance is equipped with the power terminal or power cord. A ground connection
must be connected into a properly grounded, polarised outlet.
Consult a qualified electrician if the grounding instructions are not completely understood, or
if doubt exists as to whether the appliance is properly grounded.
Do not under any circumstances cut or remove the third (ground) prong from the power cord
plug (if provided). Do not use an adapter plug with this appliance.
INSPECTION
Inspect the cartons and various components for evidence of rough handling and concealed
damage. Damage claims should be filed with the carrier.

INSTALLATION

The installation must be in accordance with AS/NZS 3500.1 and AS/NZS 3500.2, as well as the
instructions below. Pipe jointing and installation is a trade skill and Aqua Cooler recommended
this process is performed by qualified personnel only.
This drinking water cooler is designed to be operated at a water supply line pressure of up to
690kPa. The maximum operating temperature is 40°C. A pressure regulator must be installed in
front of the unit's water inlet. (see End Connection section)
GETTING STARTED:
Your Partner in Cool.
4

TOOLS REQUIRED:

• 3/8" pilot drill and either
a step drill bit up to
7/8" diameter that will
drill through SS top or
7/8" diameter punch die
(retrofit version only
• Electric drill; wrench for
punch die
• 1/4"nut driver
• #2 Phillips screwdriver
• #15 torx bit driver
• Small tubing cutter for
copper tube
INSTALLATION CONT.

ROUGH IN DRAWING

Plumbing rough-in and wall opening should be prepared as shown on Roughing-in drawing.
INSTALLATION A: Drilling hole in the top for water line connection
1. Disconnect power by unplugging unit. It might be necessary to remove the front panel to get
access to the power.
2. Turn OFF water supply to the unit. It might be necessary to remove the front panel to access
the water stop valve.
3. Place hole template onto cooler top so it is aligned with the left side of unit and wall.
4. Mark hole location.
5. Remove top from unit.
6. Using a step drill bit or 7/8" punch die, make a 7/8" hole through top. You may want to drill a
pilot hole to get these started.
7. Install snap bushing into hole to protect tubing from being cut.
5