Allied Air 4SCU14LE SERIES Manuel d'instructions d'installation et d'entretien - Page 17

Parcourez en ligne ou téléchargez le pdf Manuel d'instructions d'installation et d'entretien pour {nom_de_la_catégorie} Allied Air 4SCU14LE SERIES. Allied Air 4SCU14LE SERIES 20 pages.

4. Check all wiring for loose connections.
5. Check for correct voltage at unit (with unit operating).
6. Check amp-draw on blower motor.
Unit nameplate _________ Actual _________
Job Name _______________________________
Job Location _____________________________
Installer _________________________________
Unit Model No. ______________
Service Technician ________________________________________
Rated Load Ampacity ________
Maximum Fuse or Circuit Breaker ________________________
Electrical Connections Tight?
Indoor Blower RPM _____________
Outdoor Coil Entering Air Temperature _____________
Discharge Pressure ___________
Refrigerant Charge Checked?
Refrigerant Lines: Leak Checked?
Service Valves: Fully Opened?
Thermostat: Calibrated?
506251-01
Start-Up and Performance Checklist
Serial No. ___________________
Compressor _______________
Indoor Filter Clean?
S.P. Drop Over Indoor (Dry) ____________
Vapor Pressure ____________
Outdoor Fan Checked?
Properly Insulated?
Caps Tight?
Properly Set?
Level?
Issue 1015
Job No. ________________
City ___________________
City ___________________
Nameplate Voltage ______________
Outdoor Fan ___________________
Supply Voltage (Unit Off) ________________
Voltage with Compressor Operating _____________
Date ______________
State ______________
State ______________
Page 17 of 20