Allied Air 4SCU14LE SERIES Руководство по установке и обслуживанию - Страница 17

Просмотреть онлайн или скачать pdf Руководство по установке и обслуживанию для Кондиционер Allied Air 4SCU14LE SERIES. Allied Air 4SCU14LE SERIES 20 страниц.

4. Check all wiring for loose connections.
5. Check for correct voltage at unit (with unit operating).
6. Check amp-draw on blower motor.
Unit nameplate _________ Actual _________
Job Name _______________________________
Job Location _____________________________
Installer _________________________________
Unit Model No. ______________
Service Technician ________________________________________
Rated Load Ampacity ________
Maximum Fuse or Circuit Breaker ________________________
Electrical Connections Tight?
Indoor Blower RPM _____________
Outdoor Coil Entering Air Temperature _____________
Discharge Pressure ___________
Refrigerant Charge Checked?
Refrigerant Lines: Leak Checked?
Service Valves: Fully Opened?
Thermostat: Calibrated?
506251-01
Start-Up and Performance Checklist
Serial No. ___________________
Compressor _______________
Indoor Filter Clean?
S.P. Drop Over Indoor (Dry) ____________
Vapor Pressure ____________
Outdoor Fan Checked?
Properly Insulated?
Caps Tight?
Properly Set?
Level?
Issue 1015
Job No. ________________
City ___________________
City ___________________
Nameplate Voltage ______________
Outdoor Fan ___________________
Supply Voltage (Unit Off) ________________
Voltage with Compressor Operating _____________
Date ______________
State ______________
State ______________
Page 17 of 20