Dell S4100-ON Series Manuel d'installation - Page 24
Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} Dell S4100-ON Series. Dell S4100-ON Series 47 pages.
Également pour Dell S4100-ON Series : Manuel de configuration (21 pages), Manuel d'installation (48 pages), Manuel d'installation (49 pages)
Figure 12. Two-post center-mount installation
2
Slide the back bracket towards the post. Secure it to the post flange with two user-supplied screws, items 2 and 3.
3
Repeat this procedure for the second rail.
Four-post threaded installation
NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1
Remove the latch castings from each end of the ReadyRails assemblies. To remove the two screws each latch casting, use a Torx
driver.
Retain the latch castings for future rack requirements.
24
S4100–ON Series installation