Dell S4100-ON Series Installation Manual - Page 24

Browse online or download pdf Installation Manual for Switch Dell S4100-ON Series. Dell S4100-ON Series 47 pages.
Also for Dell S4100-ON Series: Setup Manual (21 pages), Installation Manual (48 pages), Installation Manual (49 pages)

Dell S4100-ON Series Installation Manual
Figure 12. Two-post center-mount installation
2
Slide the back bracket towards the post. Secure it to the post flange with two user-supplied screws, items 2 and 3.
3
Repeat this procedure for the second rail.

Four-post threaded installation

NOTE:
For more installation instructions, see the installation labels attached to the rail assembly.
1
Remove the latch castings from each end of the ReadyRails assemblies. To remove the two screws each latch casting, use a Torx
driver.
Retain the latch castings for future rack requirements.
24
S4100–ON Series installation