Dell Z9100-ON Manuel d'installation - Page 22

Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} Dell Z9100-ON. Dell Z9100-ON 45 pages. Open networking
Également pour Dell Z9100-ON : Manuel d'installation (43 pages), Manuel d'installation (45 pages)

Dell Z9100-ON Manuel d'installation
Figure 11. Two-post center-mount configuration
2
Slide the back bracket towards the post. Secure it to the post flange with two user-supplied screws, item 2.
3
Repeat this procedure for the second rail.

Four-post threaded configuration

CAUTION:
To be NEBS Earthquake Z4-compliant, you must remove the tool-less latch castings described in Step 1.
1
Remove the latch castings from each end of the ReadyRails assemblies. To remove the two screws each latch casting, use a Torx
driver, item 1.
Retain the latch castings for future rack requirements.
22
Z9100–ON installation