Dell Z9100-ON Panduan Instalasi - Halaman 22

Jelajahi secara online atau unduh pdf Panduan Instalasi untuk Beralih Dell Z9100-ON. Dell Z9100-ON 45 halaman. Open networking
Juga untuk Dell Z9100-ON: Panduan Instalasi (43 halaman), Panduan Instalasi (45 halaman)

Dell Z9100-ON Panduan Instalasi
Figure 11. Two-post center-mount configuration
2
Slide the back bracket towards the post. Secure it to the post flange with two user-supplied screws, item 2.
3
Repeat this procedure for the second rail.

Four-post threaded configuration

CAUTION:
To be NEBS Earthquake Z4-compliant, you must remove the tool-less latch castings described in Step 1.
1
Remove the latch castings from each end of the ReadyRails assemblies. To remove the two screws each latch casting, use a Torx
driver, item 1.
Retain the latch castings for future rack requirements.
22
Z9100–ON installation