Miller 1025 Manuel de l'opérateur - Page 6

Parcourez en ligne ou téléchargez le pdf Manuel de l'opérateur pour {nom_de_la_catégorie} Miller 1025. Miller 1025 13 pages. Fluid head

Miller 1025 Manuel de l'opérateur

Operating Instructions

The operating instructions are described in six steps. Please
read and understand these instructions before using this
equipment. Do not omit any steps.
1 Fluid Head Set-up
1.1 Loosen the PAN HANDLE CLAMP fully then rotate the
PAN HANDLE until it is approximately perpendicular to the
THREADED STUD (fig. 5) and tighten the PAN HANDLE
CLAMP - avoid contact wear between the serrations
on the Fluid Head and the PAN HANDLE CLAMP , if this
occurs then unwind the PAN HANDLE CLAMP further.
1.2 Ensure
that
the
TRIPOD
horizontal. Place the Fluid Head into the TRIPOD BOWL,
adjust the BUBBLE LEVEL (fig. 5) such that the bubble is
inside the black circle and tighten the CLAMP NUT.
1.3 Set the initial control settings as follows – see Figure 1 & 2:
Select Counterbalance to position 4 (top setting).
Select Pan & Tilt Drag to position 0.
Tighten the PAN LOCK, TILT LOCK and the SLIDING
PLATFORM LOCK.
BOWL
is
approximately
5
Illumination Button
Bubble Level
Tripod Bowl
Threaded Stud
Clamp Nut
Fig. 5