Shimano PD-EF202 Manuel du distributeur - Page 8

Parcourez en ligne ou téléchargez le pdf Manuel du distributeur pour {nom_de_la_catégorie} Shimano PD-EF202. Shimano PD-EF202 17 pages.

Shimano PD-EF202 Manuel du distributeur

Maintenance

Replacing the pins

Maintenance
Replacing the pins

PD-GR400

If the pins become worn or damaged, replace them with new pins.
1.
Replace pins as shown in the figure.

Adjusting axle bearings

Adjustment is required if the rotating parts are not functioning properly. Follow the procedures
shown below.

PD-EF202/PD-EF205

1.
Remove the cap using a tool such as a slotted screwdriver.
2.
Use the TL-PD400 SHIMANO original tool to turn the cone to adjust the
bearing preload.
1 - 1.5 N·m
Pin
Cap
8