Cisco AS5300 - Universal Access Server Manuel - Page 20
Parcourez en ligne ou téléchargez le pdf Manuel pour {nom_de_la_catégorie} Cisco AS5300 - Universal Access Server. Cisco AS5300 - Universal Access Server 21 pages. Access server
Également pour Cisco AS5300 - Universal Access Server : Annexe (10 pages), Manuel de démarrage rapide (25 pages), Manuel de configuration (46 pages)
Step 3 Install the safety ground (green wire) into the terminal block ground connector and
tighten the locking screw. Ensure that no bare wire is exposed.
Caution
Do not overtorque the terminal block contact screws. The recommended torque is 8.2 ± 0.4 inch-
lb.
Step 4 Insert the +48 VDC wire into the terminal block positive connector (+) and tighten the
locking screw. Ensure that no bare wire is exposed.
Step 5 Insert the -48 VDC wire into the terminal block negative connector (-) and tighten the
locking screw. Ensure that no bare wire is exposed.
Step 6 Secure the power supply cord to the cable strain-relief clamps on the DC power supply
with cable ties.
Warning
After wiring the DC power supply, remove the tape from the circuit breaker switch handle and
reinstate power by moving the handle of the circuit breaker to the ON position.
Step 7 Power ON the access server.
The internal power supply fan should power on.
Figure 3-15 DC Power Supply Connections