Cisco Firepower 2130 Installation & Maintenance - Page 16

Parcourez en ligne ou téléchargez le pdf Installation & Maintenance pour {nom_de_la_catégorie} Cisco Firepower 2130. Cisco Firepower 2130 26 pages. Rack-mount and ground the chassis
Également pour Cisco Firepower 2130 : Manuel (12 pages), Manuel de déploiement (8 pages), Pour commencer (42 pages)

Cisco Firepower 2130 Installation & Maintenance
Secure the Power Cord on the Power Supply Module
One side of the tie wrap has evenly spaced ridges and the other is smooth. Be sure the ridged side is face up and that you
slide it through the open side of the channel. You will hear a click as the tie slides through—it moves in one direction
only. To remove the tie wrap from the clamp, push the lever on the closed side of the box-shaped channel and slide out
the tie wrap.
Figure 7: Tie Wrap Through the Box Channel of the Clamp
1
Box channel
Step 2
Attach the clamp to the power supply module:
a) Locate the hexagonal ventilation hole on the power supply module at the center of the plug just below the power
connector body (see the following figures).
b) Plug the snapping portion of the tie wrap into the hexagonal hole.
c) With the clamp side facing up, push the tie wrap in until it is fully engaged.
Caution
Installation, Maintenance, and Upgrade
16
Make sure you have the correct location because you cannot remove the tie wrap from the power supply
module once you have installed it without damaging the tie wrap.
Installation, Maintenance, and Upgrade
2
Tie wrap