Cisco Nexus 7000 Series Manuel d'installation - Page 2

Parcourez en ligne ou téléchargez le pdf Manuel d'installation pour {nom_de_la_catégorie} Cisco Nexus 7000 Series. Cisco Nexus 7000 Series 16 pages. Switch chassis
Également pour Cisco Nexus 7000 Series : Manuel de référence (2 pages), Manuel d'instructions d'installation (39 pages), Référence (34 pages), Manuel d'installation (18 pages), Configuration (8 pages), Manuel de configuration (28 pages), Manuel de démarrage rapide (10 pages), Manuel de démarrage rapide (29 pages), Manuel d'instructions de remplacement (14 pages), Manuel d'instructions de remplacement (21 pages), Manuel de dépannage (10 pages)

Cisco Nexus 7000 Series Manuel d'installation

Unpacking and Inspecting a New Switch

If you are using the combined power mode or power-supply redundancy, you need only one power source. If
Note
you are using input-source redundancy or full redundancy, you need two power sources.
Unpacking and Inspecting a New Switch
Before you install a new chassis, you need to unpack and inspect it to be sure that you have all the items that
you ordered and verify that the switch was not damaged during shipment. If anything is damaged or missing,
contact your customer representative immediately.
Caution
When you handle the chassis or its components, you must follow ESD protocol at all times to prevent ESD
damage. This protocol includes but is not limited to wearing an ESD wrist strap that you connect to the earth
ground.
Tip
Do not discard the shipping container when you unpack the switch. Flatten the shipping cartons and store
them with the pallet used for the system. If you need to move or ship the system in the future, you will need
these containers.
Step 1
Compare the shipment to the equipment list that is provided by your customer service representative and verify that you
have received all of the ordered items.
The shipment should include boxes for the following:
• System chassis, which includes the following installed components:
• 1 supervisor module
• 1 I/0 module
• 1 fan tray
• 1 to 2 power supply units
• Switch accessory kit
To see a list of what is included in this kit, see .
• Cable management frames
• Left and right side frames
• Top and bottom hood frames
• M4x14 mm flat-head Phillips screws (4)
• Front door kit — Optional
• Front door (1) (69-100222-01)
Installing the Switch Chassis
2
Installing the Switch Chassis