Cisco UCS B200 M4 Note d'installation et d'entretien - Page 9

Parcourez en ligne ou téléchargez le pdf Note d'installation et d'entretien pour {nom_de_la_catégorie} Cisco UCS B200 M4. Cisco UCS B200 M4 30 pages. For e5-2600 v4 series cpus
Également pour Cisco UCS B200 M4 : Note d'installation et d'entretien (46 pages), Manuel de mise à jour (9 pages), Manuel d'entretien (24 pages)

Cisco UCS B200 M4 Note d'installation et d'entretien
You can use Cisco UCS Manager to format and configure RAID services. For details, see the Configuration Guide for the
version of Cisco UCS Manager that you are using. The configuration guides are available at the following URL:
www.cisco.com/en/US/products/ps10281/products_installation_and_configuration_guides_list.html
If you need to move a RAID cluster, see the
Removing a Blade Server Hard Drive
To remove a hard drive from a blade server, follow these steps:
Procedure
Step 1
Push the button to release the ejector, and then pull the hard drive from its slot.
Step 2
Place the hard drive on an antistatic mat or antistatic foam if you are not immediately reinstalling it in another server.
Step 3
Install a hard disk drive blank faceplate to keep dust out of the blade server if the slot will remain empty.

Blade Server Removal and Installation

Before performing any internal operations on this blade server, you must remove it from the chassis.
To prevent ESD damage, wear grounding wrist straps during these procedures and handle modules by the
Caution
carrier edges only.
Powering Off Blade Servers Using the Power Button
You can also shut the server down remotely using Cisco UCS Manager. For details, see the Configuration
Tip
Guide for the version of Cisco UCS Manager that you are using. The configuration guides are available
at the following URL:
configuration_guides_list.html
Procedure
Step 1
For each server in the chassis that you want to power off, check the color of the Power Status LED.
• Green indicates that the server is running and must be shut down before it can be safely powered off. Go to Step 2.
• Amber indicates that the server is already in standby mode and can be safely powered off. Go to Step 3.
Step 2
Press and release the Power button, then wait until the Power Status LED changes to amber.
Cisco UCS Manager B-Series Troubleshooting
http://www.cisco.com/en/US/products/ps10281/products_installation_and_
http://
Guide.
9