Cisco UCS B250 M1 Note d'installation et d'entretien - Page 19

Parcourez en ligne ou téléchargez le pdf Note d'installation et d'entretien pour {nom_de_la_catégorie} Cisco UCS B250 M1. Cisco UCS B250 M1 34 pages. Extended memory blade server

Cisco UCS B250 M1 Note d'installation et d'entretien
S e n d d o c u m e n t c o m m e n t s t o u c s - d o c f e e d b a c k @ c i s c o . c o m
Install a motherboard CMOS battery:
Step 2
a.
b.
c.
d.
Figure 9
CMOS battery replacement will not have any impact on UCS Manager.
Removing a CPU or Heat Sink
You can order your blade server with two CPUs, or upgrade later to a second CPU. Both CPUs must be
of the same type, and memory in slots intended for the second CPU will not be recognized if the second
CPU is not present (see
a CPU from one server to another, or to replace a faulty CPU.
Table 3
Table 3
Product ID
N20-X00001 / Xeon X5570
N20-X00002 / Xeon E5540
OL-22474-03
Press the battery socket retaining clip toward the chassis wall.
Insert the new battery into the socket with the battery's positive (+) marking toward the chassis wall.
Ensure that the retaining clip clicks over the top of the battery.
Replace the top cover.
Replace the server in the chassis, and then power on the server by pressing the Power button.
Removing and Replacing a Motherboard CMOS Battery
Memory Arrangement, page
and
Table 4
show the available CPU options:
CPU Options, M1 Models
Cisco UCS B250 Extended Memory Blade Server Installation and Service Note
26). You may need to use these procedures to move
Power Draw (W) Clock Speed
95 W
2.93 GHz
80 W
2.53 GHz
Working Inside the Extended Memory Blade Server
DDR3
Cache
1
1333
8 MB
1066
8 MB
Low
Voltage
N
N
19