Cisco UCS B420 M3 Note d'installation et d'entretien - Page 30

Parcourez en ligne ou téléchargez le pdf Note d'installation et d'entretien pour {nom_de_la_catégorie} Cisco UCS B420 M3. Cisco UCS B420 M3 38 pages. High performance blade server
Également pour Cisco UCS B420 M3 : Manuel de mise à jour (8 pages)

Cisco UCS B420 M3 Note d'installation et d'entretien
Procedure
Step 1
Using Cisco UCS Manager, perform a graceful shutdown of the server. Without a graceful shutdown, data can be permanently
lost.
Step 2
Remove the server from the chassis.
Step 3
Remove the top cover from the server.
Step 4
Remove the adapter in slot 2.
Step 5
With a No.1 Phillips screwdriver, remove the four screws holding the top plate of the Supercap's enclosure.
Step 6
Angle the top plate up and remove the tabs from the slots at the rear. Set the plate aside.
Step 7
Press the clip at the end of the Supercap's wires into the clip attached to the enclosure.
Step 8
Place the Supercap inside the enclosure.
Step 9
Slide the tabs on the top plate into the slots at the rear of the Supercap enclosure.
Step 10
With a No.1 Phillips screwdriver, replace the four screws and attach the top plate to the enclosure as shown below.
Step 11
Replace the adapter, top cover, and the server in the chassis. Cisco UCS Manager reestablishes management of the server
and the service profile.
Figure 22: Supercap Installation
30