Cisco UCS B420 M3 Kurulum ve Servis Notu - Sayfa 30

Sunucu Cisco UCS B420 M3 için çevrimiçi göz atın veya pdf Kurulum ve Servis Notu indirin. Cisco UCS B420 M3 38 sayfaları. High performance blade server
Ayrıca Cisco UCS B420 M3 için: Yükseltme Kılavuzu (8 sayfalar)

Cisco UCS B420 M3 Kurulum ve Servis Notu
Procedure
Step 1
Using Cisco UCS Manager, perform a graceful shutdown of the server. Without a graceful shutdown, data can be permanently
lost.
Step 2
Remove the server from the chassis.
Step 3
Remove the top cover from the server.
Step 4
Remove the adapter in slot 2.
Step 5
With a No.1 Phillips screwdriver, remove the four screws holding the top plate of the Supercap's enclosure.
Step 6
Angle the top plate up and remove the tabs from the slots at the rear. Set the plate aside.
Step 7
Press the clip at the end of the Supercap's wires into the clip attached to the enclosure.
Step 8
Place the Supercap inside the enclosure.
Step 9
Slide the tabs on the top plate into the slots at the rear of the Supercap enclosure.
Step 10
With a No.1 Phillips screwdriver, replace the four screws and attach the top plate to the enclosure as shown below.
Step 11
Replace the adapter, top cover, and the server in the chassis. Cisco UCS Manager reestablishes management of the server
and the service profile.
Figure 22: Supercap Installation
30