Dimplex SP420 Manuel d'installation et d'utilisation - Page 2
Parcourez en ligne ou téléchargez le pdf Manuel d'installation et d'utilisation pour {nom_de_la_catégorie} Dimplex SP420. Dimplex SP420 9 pages. Dimplex wall fires installation and operating instructions
Également pour Dimplex SP420 : Manuel de l'utilisateur (8 pages), Manuel de l'utilisateur (8 pages), Manuel d'installation et d'utilisation (8 pages)
- 1. Installation and Operating Instructions
- 2. Installation
- 3. Manual Operation
- 4. Manual Controls
- 5. Remote Control Operation
- 6. Menu Functions
- 7. Operating Instructions
- 8. Replacing the Remote Control
- 9. General Information
- 10. Important Battery Information
- 11. Lamp Replacement
- 12. After Sales Service
Installation
Do not connect appliance until properly fixed to the wall
and the Instruction leaflet is read fully.
This model is designed to be permanently fixed to a wall at a
minimum height of 300mm.
The wall bracket must be fitted horizontally and the cable
routed to the bottom right of the heater as in Fig 1.
566
outline of
wall fire
Recommended Fixing Dimensions - Fig. 2
A height of 600mm from bottom of heater to floor is
recommended for optimum viewing of fuel bed (see Fig. 2
for recommended fixing dimensions).
For optimum viewing mark the top four screw fixing positions
on wall in accordance with the recommended fixing
dimensions - see Fig. 2.
Drill holes with a 6mm drill bit. Fix the wall bracket using the
four plugs and screws provided - see Fig 3.
Carefully lift the heater up ensuring that the top rear ledge of
heater engages the wall bracket and is sitting centrally
positioned. - see Fig 4 (b).
Rotate the bottom fixing bracket down. - see Fig 4 (c).
Gently bring the heater level with the wall. - see Fig 4 (d).
outline of wall
480
fixing bracket
240
558
1158
8
600
wall
wall
plugs
fixing
bracket
screws
Fig. 3
see
detail '1'
wall bracket
slide down over
b
bracket, ensure
that ledge of
appliance engages
behind wall
bracket and is
central
d
bring level
with wall
Mark the bottom hole position (see Fig. 5), remove the heater
ensuring that the bottom fixing bracket is rotated up.
Drill and fit wall plug.
Refit the heater to the wall fixing bracket (i.e. follow steps as
in Fig. 4 a,b,c and d above) and rotate the bottom fixing
bracket down again and use the screw provided to
permanently fix the heater in place.
The heater should not be connected until the instruction leaflet
is read fully.
a
lift appliance
ledge
above wall
fixing bracket
wall
ensure ledge
bracket
at back of
fire engages
wall bracket
Detail '1'
c
rotate bottom
fixing bracket
down from its
transit position
Fig. 4
mark hole
centre with
pencil
Fig. 5