Zanussi ZHI 623 Manuel d'installation, d'utilisation et d'entretien - Page 8
Parcourez en ligne ou téléchargez le pdf Manuel d'installation, d'utilisation et d'entretien pour {nom_de_la_catégorie} Zanussi ZHI 623. Zanussi ZHI 623 15 pages.
Également pour Zanussi ZHI 623 : Manuel d'installation, d'utilisation et d'entretien (16 pages)
Installing the evacuation duct
- Depending on the choice of evacuation ducts, install the 100 or 120 mm Ø duct
which attaches to the rear box by a bayonet system.
Connection
There is an adjustment lever inside the hood
(fig. 8) for selecting "evacuation" or
"recycling" (accessible after removing the
grease filters).
- Lever down - recycling (air outlet by front
upper louvers).
- Lever up - evacuation (outlet through rear
duct). These positions must be respected in
accordance with the selected use.
Connection to an individual or collective duct
- Connect the hood to an individual or collective duct (unused flue) using pipes and
connection pieces made of uninflammable material.
- When the evacuation version hood is used, it must not hinder existing ventilation or
extraction, and must be in accordance with Unified Technical Document
DTU n° 61-1.
- Connection fittings must be made in accordance with standard practice and respect
safety conditions, and under no circumstances shall the evacuation duct discharge
into the attic.
- Flues used as smoke ducts shall not be used.
8
8