Clarke Metalworker CPTN1 Manuel d'utilisation et d'entretien - Page 10

Parcourez en ligne ou téléchargez le pdf Manuel d'utilisation et d'entretien pour {nom_de_la_catégorie} Clarke Metalworker CPTN1. Clarke Metalworker CPTN1 12 pages. Pipe notcher

Clarke Metalworker CPTN1 Manuel d'utilisation et d'entretien
12. With the lock pin removed, apply
cutting fluid, turn drill press On and
perform the notching procedure.
HAND DRILL OPERATION
ITEMS NEEDED
• 1 x 13mm & 2 x 17mm Open End Spanners or Socket Wrenches
• 1 x Hole Saw with 1/2" or 5/8" Thread
• Workbench Mounting Hardware (Not Supplied), As Needed
• Hand Drill
• Cutting Fluid, As Needed
1. Install hole saw and workpiece as described on pages 7 - 8.
2. Mount notcher to workbench using
mounting hardware (not included).
3. Loosen both hex bolts, as shown, swivel
base to desired drilling angle, and tighten
hex bolts.
Parts & Service: 020 8988 7400 / E-mail: [email protected] or [email protected]
10