Clarke Metalworker CPTN1 Manual de Instruções de Operação e Manutenção - Página 10

Procurar online ou descarregar pdf Manual de Instruções de Operação e Manutenção para Ferramentas Clarke Metalworker CPTN1. Clarke Metalworker CPTN1 12 páginas. Pipe notcher

Clarke Metalworker CPTN1 Manual de Instruções de Operação e Manutenção
12. With the lock pin removed, apply
cutting fluid, turn drill press On and
perform the notching procedure.
HAND DRILL OPERATION
ITEMS NEEDED
• 1 x 13mm & 2 x 17mm Open End Spanners or Socket Wrenches
• 1 x Hole Saw with 1/2" or 5/8" Thread
• Workbench Mounting Hardware (Not Supplied), As Needed
• Hand Drill
• Cutting Fluid, As Needed
1. Install hole saw and workpiece as described on pages 7 - 8.
2. Mount notcher to workbench using
mounting hardware (not included).
3. Loosen both hex bolts, as shown, swivel
base to desired drilling angle, and tighten
hex bolts.
Parts & Service: 020 8988 7400 / E-mail: [email protected] or [email protected]
10