CLEARSONIC IsoPac Instructions de montage

Parcourez en ligne ou téléchargez le pdf Instructions de montage pour {nom_de_la_catégorie} CLEARSONIC IsoPac. CLEARSONIC IsoPac 2 pages.

IsoPac and Height Extender Assembly Instructions
What you will need: Rubber hammer, rubbing alcohol or PPC cleaner with clean rag to
lube the panel end. A reasonably tall assistant is also great to have.
1. First, check to make sure that nothing was damaged in shipment. If you see damage,
call us as or your dealer soon as possible. Please keep your packing materials as long as
possible for storage and transport. Erect your ClearSonic Panel System according to the
usage instructions included with the panel system.
2. How to install AX12s or AX18s:
A. Your AX panels have been attached together with hinge here at the factory.
Inspect your AX panels and H-channels to make sure they were not damaged
during shipment. The "H" channel sections will be used to attach the AX Height
Extenders to the top of your ClearSonic Panel (CSP) system. Keep the packing
materials in case products need to be returned or for future storage and transport.
B. If possible, set up your large panel system in a "zigzag" configuration with
about 45 degrees of angle from one panel to the next so that it is stable. Next, peel
the masking off your CSP if you have not already done so and install the H-
channel on the top of your CSP panels taking care to line up the edge of the H-
channel with the edge of the CSP panel. Completely seat the H-channel with a
rubber hammer. Next, note the direction of the hinge fold on your CSP unit. Note
that each panel will fold 180 degrees in one direction but only 90 degrees in the
other. You will want to match the AX hinge configuration with that of the panel
system you are attaching to so that the whole unit will still fold "accordion style"
once the AX units are in place.
C. Use the PPC cleaner or alcohol/rag combo to lube and clean the bottom ½ inch
of the AX panels. This will make the surface slippery for a short while and
facilitate assembly. It works best to have an assistant hold and unfold the panels
one at a time as you do the placement and seating of the AX panels.
D. Line up one end and seat the first AX panel into the H-channel. It does not have
to seat the whole way in at this point. As the first AX is put in place, have your
assistant see that next AX panel is lined up over the next panel and starts to seat
correctly.
E. Set each succeeding AX until all are in place. You will want to go back and tap
the AX panels with your rubber hammer to make sure that they are completely
seated.
Page 1
Continued on back >