ALUZ A1-ZYZY-SQR Manuel d'instructions d'installation - Page 9

Parcourez en ligne ou téléchargez le pdf Manuel d'instructions d'installation pour {nom_de_la_catégorie} ALUZ A1-ZYZY-SQR. ALUZ A1-ZYZY-SQR 11 pages.

ZYZY
Square
A1-ZYZY-SQR
10
If applicable, connect disconnects between luminaires and push together,
leaving no gap. For Wet Location applications, use the concepts from step
7 - 9 to create a conduit jumper between luminaire segments.
11
Snap luminaires into Mounting Plates after connecting luminaire segments.
Mounted Mounting Plate
Luminaire mounted to surface
Conduit Jumper
Hole for Mounting Plate
Push together, leaving no gap
ALUZ
1170 North Red Gum Street, Anaheim, CA 92806
Phone: 800 921 2254 or 714 535 7900 | Fax: 714 535 7902 | [email protected] | aluz.lighting
© ALUZ All rights reserved. ALUZ reserves the right to make changes or withdraw specifi cations without prior notice.
Installation Instructions
9 / 1 / 2021 / Rev 0
Page 9 of 11
Wet Location Mounting (2 of 2)