Alvarado CFG Manuel d'instructions d'installation et d'entretien - Page 8

Parcourez en ligne ou téléchargez le pdf Manuel d'instructions d'installation et d'entretien pour {nom_de_la_catégorie} Alvarado CFG. Alvarado CFG 10 pages. Bi-directional waist high security gate

Maintenance

Alvarado recommends performing the maintenance steps below every (60) days. Maintenance should be performed
more frequently in high use applications and/or in dusty or humid environments.
1. Anchoring: Check that the anchors are tensioned to 20 ft-lbs. Tighten if necessary. Clean any accumulated dust
and dirt from the anchors and flange.
2. Leveling: Verify the hinge post and gate arm are horizontally and vertically level. Shim as necessary. Ensure the
gate arm and hinge post form a 90° angle.
3. Overtravel: Check the gate for overtravel. Overtravel is defined as the gate swinging in excess of 90° from the
closed position. Overtravel can lead to the gate arm colliding with adjacent fixtures, potentially causing damage to
the fixture and/or the gate. If the gate overtravels, refer to the Adjusting Swing Limit section on page 6.

Appendix A - Signage

The CSG,SSG, and CFG gates are equipped with two infill bars for mounting signage.
Fig. A1
Fig. A1
SSG with Custom Sign
A custom sign can be mounted to the CSG/SSG.
(Custom sign not included)
Page 8
PUD3570R2-0
CSG/SSG/CFG Installation and Maintenance Instructions
For Assistance: [email protected] (909) 591-8431
Fig. A2
Fig. A2
CFG with 8" x 12" Handicapped Sign
The CFG model comes with a clear acrylic sign
with a handicapped logo.
Created on: 10/7/2013
©Alvarado Mfg. Co., Inc.