BobsCNC E4 Manual - Halaman 5
Jelajahi secara online atau unduh pdf Manual untuk Sistem Kontrol BobsCNC E4. BobsCNC E4 8 halaman. Cnc router engraver bearing and rail dust kit
Juga untuk BobsCNC E4: Panduan Memulai Cepat (3 halaman)
![BobsCNC E4 Manual](/uploads/products/server2/1090966/1090966.jpg)
Step 4
The two
Mounts (B & C) have slots that
allow them to slide toward the
frame when their M-16 screws
and nuts are tightened. At this stage in
the installation do not tighten the mid
mounts. After the router/ spindle is
installed they will be tightened in order to
hold the spindle firmly in the mount.
Attach the Z Spindle Mount Bottom (B) to the Z Frame
using two M-16 screws and nuts.
Z-Spindle Mid
Hole
Slot
Step 5
Attach the Z Spindle
Mount Bottom (C) to
the Z Frame using two
M-16 screws and nuts.
Do not tighten screws
Page 5