BobsCNC E4 매뉴얼 - 페이지 5
{카테고리_이름} BobsCNC E4에 대한 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. BobsCNC E4 8 페이지. Cnc router engraver bearing and rail dust kit
BobsCNC E4에 대해서도 마찬가지입니다: 빠른 시작 매뉴얼 (3 페이지)
![BobsCNC E4 매뉴얼](/uploads/products/server2/1090966/1090966.jpg)
Step 4
The two
Mounts (B & C) have slots that
allow them to slide toward the
frame when their M-16 screws
and nuts are tightened. At this stage in
the installation do not tighten the mid
mounts. After the router/ spindle is
installed they will be tightened in order to
hold the spindle firmly in the mount.
Attach the Z Spindle Mount Bottom (B) to the Z Frame
using two M-16 screws and nuts.
Z-Spindle Mid
Hole
Slot
Step 5
Attach the Z Spindle
Mount Bottom (C) to
the Z Frame using two
M-16 screws and nuts.
Do not tighten screws
Page 5