5. 3-position control station or key-switch
(N.O. contact) (terminal block X1 and X2)
Connect 3-position control station to terminals
'OPEN', 'STOP', 'CLOSE' and 'GND'.
Important! If 3-position control station is not
used, install the jumper 'STOP' and 'GND'.
Key�switch
3�button control station

9. Programming of operator

9.1 Selection of operation logic
The logic is selected with jumpers on the control unit:
To set the required logic, set the jumpers according to the table:
Opening – Pulse
Closing- Pulse
Automatic closing is off
Opening – Pulse
Closing – Key hold-down
Automatic closing is off
(Remove the jumper JP1)
10. Adjustment of open and close positions.

10.1 Close position (red cam)

Coarse adjustment
Make sure, that the operator is fixed rigidly; put the gate in completely closed position.
Loosen the screws for coarse adjustment of red cams, then turn them so, that the micro-switches are pushed, then tighten the screws.
Open and close the gate, make sure, that the red cams push the micro-switch, and indicator DL3 on the control unit is dim.
Voltage: 220V
Jumper

8.1 Control unit connection

220V Jumper for selection
of supply voltage
380V Jumper for selection
of supply voltage
Transformer
External radio
receiver
Voltage: 380V
Jumper
OP ERATOR SH A F T -1 20 INSTAL LAT IO N AND OP E RAT ING MANU AL
Motor
Fuse
Supply voltage
3x380V 50 Hz
Jumpers
Closing
Opening
Stop button
button
button
Key�switch
3�position control station
Opening – Key hold-down
Closing – Key hold-down
Automatic closing is off
(Remove the jumper JP2)
Opening – Pulse
Closing – Pulse
Automatic closing is on
(delay 30 sec)
WIRING
Important! If there are no
End switches
safety devices, install the
jumper IR�GND
Photocells
Close
Open
Common