DoorHan SLIDING-2100 Panduan Instalasi dan Pengoperasian - Halaman 7

Jelajahi secara online atau unduh pdf Panduan Instalasi dan Pengoperasian untuk Pembuka Gerbang DoorHan SLIDING-2100. DoorHan SLIDING-2100 12 halaman. Drive
Juga untuk DoorHan SLIDING-2100: Panduan Instalasi dan Pengoperasian (16 halaman), Panduan Instalasi dan Pengoperasian (12 halaman)

DoorHan SLIDING-2100 Panduan Instalasi dan Pengoperasian

4.4. Installation of gear rack on DoorHan door

In case of drive installation on DoorHan sliding door, gear rack mounting shall be carried out as follows:
1. Install C-profile (1) on leaf mounting brackets (2) and secure
it with self-tapping screws (see figure 1).
1
3. Apply clamp (5) over C-profile so that the bolt gets
through the clamp opening (see figure 3).
5
5. Repeat steps 2-4 for other mounting assemblies. Their total number shall match the one of holes in the gear racks.
6. Place the resulting mounting assembly opposite to the
hole in gear rack (7) (see figure 5).
7
8. Align the teeth of all thesection elements using free
rack (see figure 7).
1
2
Figure 1
4. Screw the collar (6) on the bolt, but do not tighten it. Collar
5
6
Figure 3
8
Figure 5
Figure 7
2. Get round head bolt (3) and cover plate (4) into C-profile (1)
(see figure 2).
(6) shall press the clamp (5) to C-profile (1) (see figure 4).
1
7. Secure gear racks on mounting assemblies with bolts (8)
(see figure 6).
9. Tighten the mounting assemblies.
Gear rack
Зубчатая рейка
Уровень земли
Ground level
DRIVE ASSEMBLY
3
4
Figure 2
Figure 4
Figure 6
Gear rack
Шестеренка
Figure 8
Gear
7