Akva SUBSEA FEEDER Panduan Pengguna - Halaman 13

Jelajahi secara online atau unduh pdf Panduan Pengguna untuk Peralatan Memancing Akva SUBSEA FEEDER. Akva SUBSEA FEEDER 20 halaman.

4.3 ATTACHING TO PEN

Attach the AKVA Subsea Feeder to the edge of the cage using four loading straps attached
to rope, as shown in illustration 6:
weather
direction.
The ropes must be attached to the pen as instructed in the relevant user manuals for the specific
pen and net used. In some pen, ropes may be attached to the handrail. Whether this is possible
depends on the capacity of the specific pen and handrail. In cases where the rope must be
attached to the bottom of the post or around the pen ring, pull it through the net as instructed
in the user manual for the relevant net. Reinforcing the relevant section of the net will probably
be required.

4.4 INSTALLATION IN TUBENET

When installing the AKVA Subsea Feeder in a Tubenet™, follow the installation procedure
described in this user manual. Personnel who will be installing the Tubenet™ shall review and
familiarise themselves with the process before proceeding with the installation. When installing
the Subsea Feeder in a Tubenet™, do this before the inner float in the Tubenet™ is moored into
position in the middle of the outer float. Temporarily moore the inner float near the edge of the
floating collar to simplify lifting the Subsea Feeder into position in the tube. Make sure to use
approved lifting equipment and a crane with sufficient capacity for the operation. We recommend
using two cranes when lifting the AKVA Subsea Feeder for installation in a Tubenet™.
13
13
20
of
Mooring the AKVA Subsea Feeder 45 degrees against the
TM
DOCUMENT NO:
DOCUMENT PART:
DC10000901
10001800
REVISION NO:
C