INSTRUCTION – UNPACKING AND PREPARATIONS BEFORE INSTALLATION
This machine has been assembled and tested at Cold Jet's test center before being crated and shipped as one unit. Follow
the steps below to unpack and inspect the machine from the shipping container.

Unpacking and Examination for Transport Damages

1. Examine the transport box for any damages occurred during transportation.
2. Remove the top and side plates from the transport box.
3. Unbolt the 4 bolts that secure the PE50/80 to the pallet.
4. Examine the PE50/80 for external transport damages.

Requirements on the Environment Surrounding the PE50/80

o The PE50/80 must be sheltered from wind and weather.
o The ambient temperature must be minimum +5°C (+41°F).