Follett HCF1400RBT Panduan Petunjuk Instalasi - Halaman 9
Jelajahi secara online atau unduh pdf Panduan Petunjuk Instalasi untuk Pembuat Es Follett HCF1400RBT. Follett HCF1400RBT 17 halaman. For ice storage bin top-mount applications
Install the ice transport tube.
5.1
• Slide insulation onto ice transport tube
• Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with
➊
pliers
before making connection to ease assembly
• Connect ice transport tube to coupling on louvered docking station
• Connect ice transport tube to shuttle actuator
BIN • TOP-MOUNT
➌
remote condensing
Ice transport tube
➋
Hot Water
160 F (71 C)
➌
➋
5
➊
9