Follett HCF1400RBT 설치 지침 매뉴얼 - 페이지 9
{카테고리_이름} Follett HCF1400RBT에 대한 설치 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Follett HCF1400RBT 17 페이지. For ice storage bin top-mount applications
Install the ice transport tube.
5.1
• Slide insulation onto ice transport tube
• Heat end of transport tube in cup of 160 F (71 C) hot water to soften and spread with
➊
pliers
before making connection to ease assembly
• Connect ice transport tube to coupling on louvered docking station
• Connect ice transport tube to shuttle actuator
BIN • TOP-MOUNT
➌
remote condensing
Ice transport tube
➋
Hot Water
160 F (71 C)
➌
➋
5
➊
9