Follett Horizon Elite Chewblet 1410 Series Panduan Petunjuk Instalasi - Halaman 11
Jelajahi secara online atau unduh pdf Panduan Petunjuk Instalasi untuk Pembuat Es Follett Horizon Elite Chewblet 1410 Series. Follett Horizon Elite Chewblet 1410 Series 17 halaman. For drop-ins
Juga untuk Follett Horizon Elite Chewblet 1410 Series: Manual (8 halaman), Panduan Petunjuk Instalasi (16 halaman), Manual (8 halaman)
Connect docking assembly to ice machine.
7.1
Ice transport tube installation
➋
• Slide ice machine into docking assembly
ensuring that drain tube is fully seated on
barbed drain fitting
• Insert ice transport tube all the way into
coupling and tighten nut firmly
7.3
Refrigeration lines
➊
• Evacuate line set.
• Connect self-sealing liquid and suction
line fittings
➊
DROP-IN • RIDE Technology
➊
➊
➋
remote condensing
Internal connections
7.2
Water line
➋
• Insert potable water line into valve
7.4
Power cord
• Remove twist tie
• Carefully pass cord through opening and
plug into wall outlet
7
➊
➊
11