Follett Horizon Elite Chewblet 1410 Series Kurulum Talimatları Kılavuzu - Sayfa 11

Buz Yapıcı Follett Horizon Elite Chewblet 1410 Series için çevrimiçi göz atın veya pdf Kurulum Talimatları Kılavuzu indirin. Follett Horizon Elite Chewblet 1410 Series 17 sayfaları. For drop-ins
Ayrıca Follett Horizon Elite Chewblet 1410 Series için: Manuel (8 sayfalar), Kurulum Talimatları Kılavuzu (16 sayfalar), Manuel (8 sayfalar)

Follett Horizon Elite Chewblet 1410 Series Kurulum Talimatları Kılavuzu
Connect docking assembly to ice machine.
7.1
Ice transport tube installation
• Slide ice machine into docking assembly
ensuring that drain tube is fully seated on
barbed drain fitting
• Insert ice transport tube all the way into
coupling and tighten nut firmly
7.3
Refrigeration lines
• Evacuate line set.
• Connect self-sealing liquid and suction
line fittings
DROP-IN • RIDE Technology
remote condensing

Internal connections

7.2
Water line
• Insert potable water line into valve
7.4
Power cord
• Remove twist tie
• Carefully pass cord through opening and
plug into wall outlet
7
11