FIRE – 0160 MULTI-SECTION ADJUSTABLE FRAME SYSTEM FOR FLEXIBLE SUPPORTING CONSTRUCTION
M10 drop rods
AFS rails
Access door for
inspection / damper reset
While we have tested a damper 2,000 x 2,000mm, larger sizes can be supplied but the installation will need to be checked by a
competent structural engineer as stated in the Extended Fields of Application BS EN 15882-2:2015. With all larger sizes there should
be a risk assessment carried out and a full method statement documented to ensure the correct lifting gear and safety precautions
are put in place prior to the installation being carried out.
0160 MULTISECTION W/AFS
PRODUCT
TBA
CLASSIFICATION REPORT NO.
TESTED INSTALLATION METHOD SHOWN. DIFFERING INSTALLATION METHODS TO THIS MUST BE APPROVED BY THE BUILDING CONTROL AUTHORITY (BCA) BEFORE PROCEEDING.
Preparation
1
Fire batt
2
3
Patented Adjustable Frame System
Installation sequence
(AFS) incorporating bracket, bracket
slot, and Z-piece
4
(Patent No: GB2557865)
0160 Series fire damper
5
6
7
Spigot infills
8
9
AFS bracket, bracket slot,
and Z-piece
10
0160 Series fire damper
11
12
Two hour rated flexible supporting
13
construction to BS EN 1363-1:2020
Steel stud depth – 71 to 100mm
15mm thick gypsum boards
14
15
16
FLEXIBLE SUPPORTING CONSTRUCTION
APPLICATION
E120 (VE I O)
CLASSIFICATION
Nom. duct width
1001-2,000mm
Ensure that the damper is kept
in a clean dry environment and
Nom. duct height
that there is no damage to the
1001-1146mm
damper.
1147-1521mm
Remove all the packaging and
1552-1996mm
transit ties before installation.
1997-2000mm
Work out the opening size to be
cut using the adjacent table.
The drywall will consist of two layers of 15mm plasterboard each side of steel studwork with an
optional mineral wool insulation. The opening will be a letterbox construction with overlapping layers
of plasterboard with an opening clearance around the damper casing in line with the above table.
Two M10 drop rods per fire damper shall be fitted on both sides of the drywall. These should be
securely installed in line with the manufacturer's fixing instructions in a position to match the AFS rail.
The drop rods should have a nut screwed on for clamping the rail from above. These rods will be
secured to the two top AFS rails.
Slide the AFS rails in all the brackets and insert the "Z" piece into the bracket slot pushing it up against
the underside of the rail. Insert the 8mm bolt from above into the slot through the "Z" piece fitting the
nut until tight to secure the rail.
Additional drop rods should then be passed through the top and bottom rails and fully tightened.
The damper should be mounted centrally in the opening flush with the wall on one side. The anchored
drop rods are to slide through the top rails and nuts are screwed on to take the support. The damper must
then be levelled and when in the correct position the nut above the rail should be tightened against the rail.
The galvanised mild steel ductwork connecting to the damper spigots must overlap by up to 40mm,
leaving a minimum 10mm clearance for any duct expansion in a fire situation.
The galvanised mild steel ductwork connections must be sealed with an approved galvanised mild
steel ductwork sealer and fixed with low resistance fixings such as aluminium rivets that will melt at
high temperature allowing the duct to break away without effecting the integrity of the installation.
The connecting galvanised mild steel ductwork must be independently supported within one metre of
the connections and have been installed in accordance with DW144.
The gap between the damper and the wall opening will need filling with two layers of 50mm thick
140kg/m3 fire batt cut to an interference fit and pushed in to place. All cut edges must be sealed with
a firebatt sealant to BS EN 13501-2. A fire rated intumescent mastic (to BS EN 13501-2) shall be applied
to each joint.
An access door should be fitted on the access side of the damper to enable the resetting of the
damper blades.
When the damper installation has been completed checks should be made to ensure the AFS rails are
secured to the damper and there is no movement, operation of the damper should be checked.
Complete DW145 Fire Damper Certificate.
Opening width min.
Opening width max.
Nom. duct +194mm
Nom. duct +350mm
Opening height min.
Opening height max.
Nom. duct +150mm
Nom. duct +400mm
Nom. duct +175mm
Nom. duct +425mm
Nom. duct +200mm
Nom. duct +450mm
Nom. duct +225mm
Nom. duct +475mm
6