Surface Preparation
➀ Move frame assembly out of the way, unroll viewing surface and place on
smooth/clean surface. (Orient viewing surface so that folded side of hem is
visible.)
➁ Insert plastic tubing inside pocket formed by hem on all 4 edges of viewing
surface (see Fig. 6).
➂ Carefully slide surface retention extrusion (rounded edge visible) along
hem and onto surface on all four edges of fabric (see Fig. 7).
Caution: Do not allow fabric to snag on the ends of the
extrusions. If the screen fabric is not parallel with the surface
retention extrusion, then it may slit and tear during installation.
Please Note: To make this step easier, pinch the end of the pocket closed
before sliding it into the surface retention extrusion.
Surface Retention
Extrusion
Back of
Viewing Surface
➃ Surface retention extrusion should extend beyond edge of viewing surface
equally at both ends.
➄ Verify that all surface retention extrusions are installed with rounded edge
visible and are centered on surface material.
Surface to Frame Assembly
➀ Return frame onto clean surface, face down, and drape completed surface
assembly over completed frame profi le with rounded edge of surface
retention extrusion visible.
➁ Insert any side of surface to notch #1 on corresponding side of frame
extrusion (see Fig. 8).
Viewing Surface
Fabric Attachment Extrusions
➂ Insert opposite side of surface to notch #1 of frame extrusion.
➃ Repeat steps 2-3 with remaining edges of surface.
➄ Ensure surface retention extrusions are centered lengthwise in tension
slots on all 4 edges of surface.
➅ If additional tension is desired or required over time, adjust surface one
edge at a time to tension notch #2.
Please Note: It is not necessary to adjust more than one edge at a time to
increase surface tension.
Figure 6
Plastic Tubing
Back of
Viewing Surface
Figure 7
Surface Retention Extrusion
Figure 8
www.draperinc.com
Mounting Screen to Wall
➀ Determine height at which screen is to be mounted.
Please Note: Top edge of screen frame will be located ½" above mounting
bracket hole centerline when mounted to wall.
➁ Mark hole centerline so that both Z-brackets can be mounted parallel and
at equal height.
➂ Install Z-brackets so that the outermost edges are safely within the overall
length of the aluminum frame extrusion to allow for minor horizontal screen
adjustments (hardware for mounting Z-brackets to wall is not supplied).
➃ Position screen slightly above Z-brackets on wall (see Fig. 9).
Please Note: When lifting screen, do not lift at only one corner; lift at
both corners. Lifting by one corner could result in damage to the screen
frame, especially on large screens.
Z-brackets
supplied with
screen. Installer is
responsible for
ensuring appropriate
hardware is used.
➄ Lower screen until it engages over Z-brackets. Center screen horizontally
on brackets as necessary.
Please Note: Make sure screen is installed level.
Clarion Frame—Side Detail*
2"
*Viewing surface is approximately ¼" from wall.
Clarion (Exploded Rear View)
Surface
Retention
Extrusions (4)
Please Note: To avoid damage to the frame corners, be sure to support a
minimum of two (2) corners when lifting or transporting screen.
(765) 987-7999
Page 2 of 2
Figure 9
1¼"
Plastic
Tubing (4)
Viewing
Surface