Elsema iS250 Panduan Pengguna - Halaman 7
Jelajahi secara online atau unduh pdf Panduan Pengguna untuk Pembuka Gerbang Elsema iS250. Elsema iS250 12 halaman. Swing gate opener
Figure 1
D. INSTALLATION OF FRONT BRACKET
For proper operation, the front bracket should be fixed so the motor has the correct angle. Use Table 1 to
calculate the location of the front bracket. Also note that the front bracket is 50mm lower than the rear
bracket.
A (mm)
120
130
140
150
160
170
180
190
200
iS250/iS250D/iS250Solar SWING GATE OPENER MANUAL
Table 1
E (mm)
760
750
740
730
720
710
700
690
680
Graph 2
5