Datapath VSN900 Series Panduan Memulai Cepat - Halaman 11

Jelajahi secara online atau unduh pdf Panduan Memulai Cepat untuk Pengontrol Datapath VSN900 Series. Datapath VSN900 Series 13 halaman. Wall controller

STEP 7 POWERING UP THE SYSTEM

1
Connect power cables then plug into a mains supply.
2
Switch on the power supply units.
If you have an VSN Expansion Chassis connected to the main unit then the power
supply units on the expansion chassis should be switched on prior the main unit.
There is no requirement to "switch on the system" (3) on an expansion chassis.
Page 6
3
Switch on the system.