Datapath VSN900 Series Manual de início rápido - Página 11

Procurar online ou descarregar pdf Manual de início rápido para Controlador Datapath VSN900 Series. Datapath VSN900 Series 13 páginas. Wall controller

STEP 7 POWERING UP THE SYSTEM

1
Connect power cables then plug into a mains supply.
2
Switch on the power supply units.
If you have an VSN Expansion Chassis connected to the main unit then the power
supply units on the expansion chassis should be switched on prior the main unit.
There is no requirement to "switch on the system" (3) on an expansion chassis.
Page 6
3
Switch on the system.