GRDIAN Charger Plus Panduan Pengguna - Halaman 10

Jelajahi secara online atau unduh pdf Panduan Pengguna untuk Peralatan Uji GRDIAN Charger Plus. GRDIAN Charger Plus 18 halaman. Hardwire kit

STEP 4: LINE AND LOAD SIDE

LINE AND LOAD SIDE
In this step we will be checking to see which
side of your constant and switched fuse is
line and draw.
With the add-a-fuse inserted, test the line
and load side with your multimeter. The
bottom left slot should read 12V while the
bottom right slot should read 0V.
HOW TO DETERMINE LINE AND LOAD SIDE
1.
Turn on ONLY your vehicle's electrical system.
2. Set your multimeter to 20 DCV.
3. Remove either your constant or switched fuse. (You will repeat the steps for the other fuse)
4. Insert your add-a-fuse into the empty fuse slot.
5. With the black lead touching your ground point, test for line side by placing the
on the bottom left slot of your add-a-fuse. It should read 12V.
6. With the black lead touching your ground point, test for load side by placing the
on the bottom right slot of your add-a-fuse. It should read 0V.
7. If the above is the case, you have located the line side of your fuse and have placed your
add-a-fuse correctly. If not, remove and place the add-a-fuse in reverse. Repeat steps 6
& 7 to test. Test both slots again to make sure the left bottom slot reads 12V and the right
bottom slot reads 0V.
8. Repeat steps above for the other fuse.
7
red
lead
red
lead