Active Storage mRAID16 Panduan Memulai Cepat - Halaman 4
Jelajahi secara online atau unduh pdf Panduan Memulai Cepat untuk Penyimpanan Active Storage mRAID16. Active Storage mRAID16 16 halaman.
Installing bearing guide rails for mVault75
(1) Pull out the inner rail of the ball bearing guide rails.
Left guide rail
(3) Loosen the screws and adjust the length of the ball
bearing guide rail to be the same as the cabinet depth.
(2) Remove a rail support.
Right guide rail
(4) Install the ball bearing guide rails.