Gaggenau AI 202 Manual Petunjuk Pengoperasian dan Perakitan - Halaman 17
Jelajahi secara online atau unduh pdf Manual Petunjuk Pengoperasian dan Perakitan untuk Kap Ventilasi Gaggenau AI 202. Gaggenau AI 202 19 halaman.
Juga untuk Gaggenau AI 202: Manual Petunjuk Pengoperasian dan Perakitan (20 halaman)
Fig. 22
Fig. 23
Fig. 24
16
5. Hang the support frame with the two key-holes
to the two screws in the ceiling and attach it
with all 4 screws to the ceiling. The marking
"FRONT" must be on the same side as the
control panel after installation.
Circulating air mode
circulating air switch module and fix it to
support frame (Fig. 22 and 23). Cut the flexible
air pipe to the required length and fix it to the
extractor hood.
6. Remove the cover plate from the rear of the
support frame (Fig. 24).
only:
assemble the