Gaggenau AI 202 작동 및 조립 지침 매뉴얼 - 페이지 17

{카테고리_이름} Gaggenau AI 202에 대한 작동 및 조립 지침 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. Gaggenau AI 202 19 페이지.
Gaggenau AI 202에 대해서도 마찬가지입니다: 작동 및 조립 지침 매뉴얼 (20 페이지)

Fig. 22
Fig. 23
Fig. 24
16
5. Hang the support frame with the two key-holes
to the two screws in the ceiling and attach it
with all 4 screws to the ceiling. The marking
"FRONT" must be on the same side as the
control panel after installation.
Circulating air mode
circulating air switch module and fix it to
support frame (Fig. 22 and 23). Cut the flexible
air pipe to the required length and fix it to the
extractor hood.
6. Remove the cover plate from the rear of the
support frame (Fig. 24).
only:
assemble the