HighPoint R1000 Series Panduan Instalasi Cepat - Halaman 7

Jelajahi secara online atau unduh pdf Panduan Instalasi Cepat untuk Perangkat Keras Komputer HighPoint R1000 Series. HighPoint R1000 Series 10 halaman. 4x m.2 port to pcie 3.0 x8/x16 nvme hba's
Juga untuk HighPoint R1000 Series: Panduan Instalasi Cepat (8 halaman), Panduan Instalasi Cepat (9 halaman)

HighPoint R1000 Series Panduan Instalasi Cepat
Step 8. After installing all SSDs, carefully flip the heatsink to the right.
Note:
Make sure the SSD's are carefully, but securely installed
into each M.2 port. Loose connections can cause a variety of
stability and performance issues, and may ultimately result in
data loss.
Note:
Make sure the heatsink/fan panel is properly aligned with
the controller board (PCB), and that it makes full contact with the
thermal pads before refastening it to the NVMe HBA. If the
heatsink is improperly installed, it will be unable to sufficiently
cool the NVMe SSD's and controller componentry, which may
result in damage to the SSD's or controller hardware,
performance loss, unstable I/O, and the loss of data.
Step 9. Carefully reinsert in the power supply cable of the cooling fan
that was removed in step 2.
7