HighPoint R1000 Series 빠른 설치 매뉴얼 - 페이지 7
{카테고리_이름} HighPoint R1000 Series에 대한 빠른 설치 매뉴얼을 온라인으로 검색하거나 PDF를 다운로드하세요. HighPoint R1000 Series 10 페이지. 4x m.2 port to pcie 3.0 x8/x16 nvme hba's
HighPoint R1000 Series에 대해서도 마찬가지입니다: 빠른 설치 매뉴얼 (8 페이지), 빠른 설치 매뉴얼 (9 페이지)
Step 8. After installing all SSDs, carefully flip the heatsink to the right.
Note:
Make sure the SSD's are carefully, but securely installed
into each M.2 port. Loose connections can cause a variety of
stability and performance issues, and may ultimately result in
data loss.
Note:
Make sure the heatsink/fan panel is properly aligned with
the controller board (PCB), and that it makes full contact with the
thermal pads before refastening it to the NVMe HBA. If the
heatsink is improperly installed, it will be unable to sufficiently
cool the NVMe SSD's and controller componentry, which may
result in damage to the SSD's or controller hardware,
performance loss, unstable I/O, and the loss of data.
Step 9. Carefully reinsert in the power supply cable of the cooling fan
that was removed in step 2.
7