AGS Parksafe Control Panel Panduan Pemasangan & Pengoperasian
Jelajahi secara online atau unduh pdf Panduan Pemasangan & Pengoperasian untuk Panel Kontrol AGS Parksafe Control Panel. AGS Parksafe Control Panel 16 halaman. Ventilation control panel
Juga untuk AGS Parksafe Control Panel: Panduan Pemasangan & Pengoperasian (16 halaman), Pengoperasian & Pemeliharaan Instalasi (16 halaman), Panduan Pemasangan, Pengoperasian & Pemeliharaan (20 halaman)
Installation & Operation Manual
Parksafe
PARKSAFE
Ventilation Control Panel
Installation & Operation Manual
Please read this manual carefully and retain for future use.
The control panel is designed to be paired with Parksafe Nitrogen Dioxide (NO
) and Carbon Monoxide (CO)
2
gas detectors for installation in car parking facilities and enclosed garages. The control panel will monitor up to
16 gas detectors and automatically control ventilation systems according to gas levels and temperature.
The information contained within this manual should be referenced for typical installation and operation only.
For specific requirements that may deviate from the information in this guide – contact your supplier.
AGS Parksafe Panel - IOM Iss: 6 10-20
1