AGS Parksafe Control Panel Pengoperasian & Pemeliharaan Instalasi
Jelajahi secara online atau unduh pdf Pengoperasian & Pemeliharaan Instalasi untuk Panel Kontrol AGS Parksafe Control Panel. AGS Parksafe Control Panel 16 halaman. Ventilation control panel
Juga untuk AGS Parksafe Control Panel: Panduan Pemasangan & Pengoperasian (16 halaman), Panduan Pemasangan & Pengoperasian (16 halaman), Panduan Pemasangan, Pengoperasian & Pemeliharaan (20 halaman)
Installation, Operation & Maintenance
Parksafe Ventilation Control Panel
The control panel designed to be paired with Parksafe Nitrogen Dioxide (NO
for installation in car parking facilities and enclosed garages. The control panel will monitor up to 16 gas detectors per
cable run and automatically control ventilation systems according to gas levels and temperature.
The information contained within this manual should be referenced for typical installation and operation only.
For specific requirements that may deviate from the information in this manual – contact your supplier.
Rev: 13
0721
Ventilation Control System
Installation, Operation & Maintenance
Please read this manual carefully and retain for future use.
Parksafe Control Panel
) and Carbon Monoxide (CO) gas detectors
2
1