AGT INDUSTRIAL AGT-ST4040C Panduan Produk - Halaman 8

Jelajahi secara online atau unduh pdf Panduan Produk untuk Peralatan Industri AGT INDUSTRIAL AGT-ST4040C. AGT INDUSTRIAL AGT-ST4040C 10 halaman. 40ft x 40ft container roof shelter

different directions. When the truss is up, tie the ropes to the heavy objects to
make sure the truss will stay upright steady, and use Self locking bolt (#15)to
connect the truss to the base plate, total (4) Self locking bolt (#15) are used to
secure one truss on the baseplate.
Repeat above step to put up all other trusses (from 2rd to 9th truss), and
connect all purlins. Now the whole structure is completely up. (refer to figure 5)
Parts used in this step.
- (56) Roof purlin (#5)
- (16) Ridge steel tension cable (#8)
- (8) Cable connection plate (#9)
- (10) Pull ear (#12)
- (36) Self locking bolt (#15)
- (63) Self locking bolt (#16)
Step 5 : Install roof cover
NOTE: The cover must be installed on a windless day. DO NOT attempt to install
the cover during windy conditions.
8
Figure 5