Airglas GLH3000 Nose Ski Petunjuk Untuk Kelaikan Terbang Lanjutan - Halaman 9

Jelajahi secara online atau unduh pdf Petunjuk Untuk Kelaikan Terbang Lanjutan untuk Pesawat terbang Airglas GLH3000 Nose Ski. Airglas GLH3000 Nose Ski 17 halaman. Ski kit for piper pa-18, pa-12, cc-18, s-18-180, sky international, inc. aviat a-1, a-1a, a-1b, a-1c-180, a-1c-200

Page Revision B
1.
Select an appropriate location for the control panel in the cockpit within view and reach of the
(Usually an unoccupied instrument hole is sufficient.)
pilot.
2. Determine the lengths of wire required to reach the Master side of the bus and route the wires
IAW AC 43.13 recommended practices.
3. Follow the wiring diagram provided to insure the connections are correct.
1. Use the original battery location for the hydraulic pump if it is available.
2. If the battery compartment cannot be used, a location in the baggage compartment may be
used (See Note #1).
3. The pump mounting must be able to sustain a 9G forward impact and remain secure.
4. Hydraulic lines must be routed and secured so that they do not interfere with flight controls
and are not able to chafe (See Note #1).
5. Power supply and control wires for the pump must be routed through the aircraft IAW AC
43.13 recommended practices.
Note #1: All electrical and hydraulic components located in the baggage or passenger
compartments must be protected (shielded) from damage by shifting cargo or other
damage.
Installation instructions for the Parker-Electro/Hydraulic pump.
1.
Make sure that the polarity for the pump is correct.
a. Switch sends power to blue or black wire during "Ski" selection.
This will pressurize the "UP" port of the pump.
b. Switch sends power to the green or orange wire when "Wheels" are selected.
This will pressurize the "DOWN" side of the pump.
On (GLH3000) skis make sure the "UP" Port on the pump goes to the FWD fitting on
the deployment Cylinder.
2.
When arranging the switch and indicator lights on the control panel, make sure that the
switch "UP" position is for
lights).
NOT following these instructions WILL make the system OPERATE INCORRECTLY.
MANUAL REVISION B
THIS MANUAL INCLUDES INFORMATION PROPRIETARY TO
(3.0 I nstallation, Continued)
COCKPIT CONTROLS
HYDRAULIC PUMP & LINE ROUTING
BLUE 12 V
or Black 24V (SKIS)
Airglas, Inc.
ASSEMBLY WITHOUT THE PRIOR WRITTEN PERMISSION OF
(LH4000 and GLH3000)
GREEN 12V
Skis (Yellow Lights)
AND SHALL NOT BE USED TO MANUFACTURE OR REPRODUCE ANY PART OR
Manual # GLH3000-105
Airglas, Inc.
or
Orange 24 V
and switch "DOWN" is for
27 July 2011
Airglas, Inc.
(WHEELS)
Wheels (green
9 |
P a g e